Start with the one-line and project basis
Provide the latest one-line diagram showing the source, transformer data, main and feeder devices, bus ties, alternate sources and connected loads. Mark the intended normal operating arrangement and identify any standby generation, transfer equipment or utility interface. These details help establish the assembly’s function and reveal questions that a simple equipment schedule may leave unanswered.
Include the project location in Georgia, the facility type, new or replacement scope, and the required in-service date. If the one-line is preliminary, label it accordingly and identify what remains undecided. Engineering can then distinguish confirmed design inputs from assumptions before configuration and procurement choices become difficult to change.
Define the electrical ratings to review
Share system voltage, frequency, phase and the available fault-current information at the proposed connection point. Include the source transformer’s size and impedance when available, plus utility or project-study data used to establish fault duty. The engineer of record and applicable authority determine the design basis; a manufacturer review should not substitute for their calculations or approval.
Identify continuous current needs, anticipated load growth, operating conditions and any required device functions. Ask whether the proposed interrupting and withstand ratings, bus arrangement and protective-device selections align with the approved study and specifications. Rating choices affect component selection, enclosure configuration and cost, so unresolved values should be called out for confirmation rather than treated as settled.
Resolve protection and operating intent
Provide the protective-device schedule or specification, including trip functions, sensor or rating-plug requirements, ground-fault provisions and any coordination criteria. If selective coordination, arc-energy analysis or other study results govern the project, share the applicable documents and identify the responsible engineer. Device settings and coordination conclusions require project-specific review; they should not be inferred from a one-line alone.
Describe how operators expect the system to work: which sources may run together, what a tie breaker is intended to do, and whether interlocking or metering is specified. Note remote indications, control power, communications protocols and monitoring points. Clear operating intent helps align the physical arrangement and control interfaces with actual facility procedures.
Check space, environment and interfaces
Send room plans, equipment elevations and access constraints, including available wall space, aisle clearances, door and pathway dimensions, floor conditions and any limits on lineup length or depth. State whether cable entry is top or bottom, where conduits or bus connections approach, and which side must remain accessible. These constraints can shape section layout and should be checked before drawings are finalized.
Document environmental and installation conditions such as indoor or outdoor location, ambient range, moisture, dust, corrosive exposure, seismic requirements and elevation when relevant to the specification. Identify interfaces with transformers, generators, existing gear, building systems and utility equipment. Do not assume a standard enclosure or connection will suit the site; confirm requirements against the project documents and engineering review.
Make procurement decisions before release
The specification should identify the required assembly type, number and function of sections, preferred manufacturers or approved component requirements, metering, accessories, finish and documentation. For a UL 891 switchboard assembly, state that requirement explicitly and confirm the intended product scope. UL 891 applies to switchboards; it is not a blanket listing for medium- or high-voltage switchgear.
Discuss what is fixed and what may be engineered to fit, including device families, spare provisions, future feeder capacity and preferred delivery sequence. American-made components and custom-built configurations may be considered where they meet the project requirements, but component availability and exact scope must be confirmed for each order. Short lead times are a planning goal, not a substitute for checking current availability and submittal needs.
Turn review comments into a clean handoff
For a quote, share the one-line, equipment specification, load or feeder schedule, fault-current basis, relevant study excerpts, room layout, interface requirements and target dates. Identify the engineer of record, who will approve submittals, and how deviations or open questions should be documented. This gives the manufacturer a usable basis to identify scope gaps and develop a configuration for review rather than price around hidden assumptions.
Before release, reconcile approved drawings with the final device schedule, connection locations, control interfaces, labels and shipping breakdown. For a Georgia delivery, confirm the site address, receiving hours, unloading capability, route or access restrictions and required delivery sequence. Exact scope, availability and timeline are confirmed for each order; submit the latest project documents and list unresolved decisions so the review can begin with the right engineering questions.