Georgia facility teams planning optional standby power must decide which loads need backup, how the source will transfer, and what happens when demand exceeds available generator capacity. Those choices shape switchgear configuration, operating priorities, and procurement scope. A clear load list and sequence of operation help engineers compare automatic transfer, selective service, and load shedding before equipment is specified.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Define the loads worth supporting

Optional standby systems serve selected loads rather than every building circuit. Typical priorities may include refrigeration, selected lighting, communications, pumps, process controls, or other equipment whose interruption creates operational or financial consequences. Identify each load, its location, operating schedule, and required duration, then distinguish essential functions from convenience loads. The final selection depends on the facility’s operating plan and engineering review, not on a generic list.

For each candidate load, record voltage, phase, current or horsepower, starting method, and whether it can tolerate a brief interruption. Motors, transformers, and electronic power supplies can impose startup or inrush demands that differ from their normal running load. Note equipment that must restart in sequence, remain continuously powered, or shut down in a controlled manner. This information helps the design team estimate generator demand and decide whether circuits should transfer together or in stages.

Match generator capacity to operating priorities

Generator sizing involves more than adding nameplate loads. The engineer should evaluate expected simultaneous operation, motor starting, power factor, nonlinear loads, and the generator’s response to changing demand. A conservative assumption that every load starts at once can drive unnecessary capacity, while an optimistic assumption can cause voltage or frequency disturbance when loads transfer. Use operating scenarios that reflect actual facility use, including the conditions most likely to occur during an outage.

Capacity choices carry a practical tradeoff: a larger source may support more loads without intervention, but can increase equipment scope and operating cost. A smaller source can be workable when the load schedule is selective and priorities are enforceable. Ask the engineer to identify which loads are included in the design basis, which are excluded, and what contingency is allowed. Confirm whether future expansion is expected and whether the switchgear arrangement can accommodate it; do not assume spare capacity or space unless it is specified.

Choose the transfer approach

Automatic transfer can restore selected loads without waiting for an operator, but the sequence must suit the facility and the generator. The design should define which source conditions initiate transfer, how the alternate source is qualified, and when loads return to normal power. Transfer timing matters for equipment that cannot tolerate interruption, while staged pickup can prevent a large block of demand from being applied at once. Engineers should also establish how operators will know that transfer occurred and what conditions require manual action.

Not every optional load needs automatic restoration. Manual transfer or operator-controlled pickup may reduce simultaneous demand and give staff control over priorities, but it relies on trained personnel and an available response. Compare the consequences of delayed restoration with the added control and coordination required by automation. Specify the intended operating sequence, including normal-source return and generator cooldown behavior, with the responsible electrical engineer. Transfer equipment and switchboard scope must be selected for the system design; UL 891 applies to switchboard assemblies, not as a blanket listing for other switchgear or transfer equipment.

Make load shedding an operating plan

Load shedding removes or blocks lower-priority loads when demand approaches the generator’s practical limit. It can allow a smaller source to support critical functions, but only if the controls act predictably and the facility can live with interrupted loads. Define priority tiers, pickup and dropout conditions, restart delays, and whether shedding is automatic or operator-directed. Consider what happens if a shed load attempts to restart, if generator capacity changes, or if a control signal is lost.

The load-shed sequence should reflect process dependencies, not just a ranking by circuit size. A ventilation fan, control panel, or pump may support another load that appears more important in isolation. Review interlocks and restart behavior with operations and controls personnel, and document which equipment may stop without creating a separate hazard or process upset. The final sequence should be tested and handed off with clear operating instructions, alarm meanings, and responsibility for maintaining the load priorities.

Prepare a quote-ready project scope

For a manufacturer quote, share the one-line diagram or a preliminary system diagram, available service and generator data, load schedule, transfer requirements, and any specified fault-current or coordination information. Include enclosure location, installation environment, cable entry preferences, space constraints, control interfaces, and required future provisions. Identify the project stage, applicable drawings or specifications, and who will approve submittals. Exact equipment scope, component availability, and production timing are confirmed for each order.

For Georgia projects, coordinate the requested delivery point and site access with the construction schedule, receiving hours, offloading plan, and installation sequence. Nationwide shipping can support projects across the state, but delivery arrangements and timing must be confirmed for the specific order. Before release, align the approved drawings, load priorities, transfer sequence, and field interfaces among the engineer, contractor, facility team, and equipment supplier. Send those details with the quote request so the proposed switchgear configuration can be evaluated against the actual standby plan.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.