Configurations

Main-Main Switchgear Arrangements

A main-main arrangement brings two incoming sources to separate main devices, with operating logic that determines how the loads are supplied and whether the sources can be paralleled. Georgia facility engineers, contractors, and purchasing teams should define the intended source relationship, transfer method, and load priorities before requesting a new assembly. Those decisions shape the one-line, controls, and procurement scope.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Define what the two sources are meant to do

Start with the source arrangement, not just the number of incoming breakers. The two feeds might represent normal and alternate utility service, utility and generator supply, or two independent sources serving different operating conditions. State whether both sources are normally available, whether one is standby, and which loads must remain supplied during a source interruption. These answers establish the operating sequence the equipment must support.

Provide source voltage, phase, frequency, available fault-current information, grounding method, and the expected source capacity where known. Identify whether the sources can ever be energized at the same time and whether paralleling is permitted by the system design and utility or generator controls. Two incoming devices do not by themselves establish that sources are independent or suitable for parallel operation; engineering review must confirm the source relationship and constraints.

Choose the transfer and interlocking approach

A typical main-main lineup uses two main devices connected to a common bus, with a tie device separating bus sections. The intended sequence may keep one main and the tie closed while the other main remains open, or use another defined state. Mechanical and electrical interlocks can prevent prohibited combinations, while control logic can coordinate a transfer after source conditions are evaluated. The one-line and control narrative should show every allowed and blocked state.

Specify whether transfer is manual, electrically operated, automatic, or part of a larger control system. For automatic operation, define acceptable source conditions, transfer delay requirements, return-to-normal behavior, and what happens if the alternate source is unavailable. Identify whether open-transition transfer is required or whether closed-transition operation is being considered. Closed transition can momentarily parallel sources and requires explicit engineering, protective, and utility coordination; it should never be assumed from a request for two mains.

Coordinate protection, metering, and control details

Protection must match the available sources and the bus operating states. Share anticipated fault-current data at each incoming point and clarify whether source conditions differ. The engineer should evaluate breaker trip functions and settings, coordination, selective operation, and the consequences of operating with a bus tie closed. Settings and final protection decisions depend on the system study and applicable authority review, rather than a generic main-main template.

Describe required metering, source indication, alarms, control power, remote status, and interfaces to generators or facility controls. If the arrangement depends on voltage, frequency, phase, or communications signals, identify the expected inputs and the responsible control system. Also clarify whether operators need local selector switches, permissive indications, or a documented sequence. These details affect the control schematics, wiring, and factory configuration.

Fit the lineup to the facility and installation

For a new UL 891 switchboard assembly, provide the required bus arrangement, incoming and outgoing circuit scope, enclosure and access constraints, and the project drawings available for review. Confirm whether the mains and tie are part of one lineup or connect to equipment supplied under separate scopes. Physical dimensions, cable entry, termination space, and service access need coordination with the room and installation plan; final configuration depends on engineering review.

Document the site conditions that affect equipment selection and layout, including indoor or outdoor location, environmental exposure, elevation if relevant, and available working space. Identify shipping access, receiving limits, and the planned installation sequence. An unusual room opening, restricted delivery route, or phased cutover can affect how sections are arranged and shipped, so raise these constraints before the assembly is released for production.

Prepare a complete request for quotation

For a useful quote, send the latest one-line, source descriptions, system voltage, known fault-current data, load schedule, required breaker functions, and transfer narrative. Include bus and tie requirements, control and metering scope, drawings, specifications, and any project standards. State what information remains preliminary and identify decisions still awaiting the engineer, utility, generator supplier, or authority having jurisdiction.

For Georgia delivery, share the project location, required delivery window, receiving arrangements, and any site restrictions so shipping and order timing can be coordinated. American-made components, custom-built configurations, nationwide shipping, and short lead times are part of our supply focus, but availability and schedule are confirmed for each order. Before release, align the approved one-line, interlock matrix, control sequence, and submittal documents among the engineer, contractor, facility team, and manufacturer.

Close the operating logic before release

A main-main design is ready to advance when the team can explain normal operation, source failure response, transfer conditions, tie behavior, restoration, and the response to control or source problems. Resolve whether any source combination is prohibited and how that prohibition is enforced. Review the sequence against protection, generator or utility interfaces, and the facility’s operating procedures before approving the final equipment configuration.

For your quote package, mark the intended normal state on the one-line and attach a concise transfer sequence that identifies each device’s permitted position. Add source data, load priorities, project drawings, and Georgia delivery constraints, then flag unresolved engineering decisions. This focused handoff gives the manufacturer a defined basis for configuring the new assembly and helps the project team confirm that the proposed arrangement matches the intended operation.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.