Emergency power distribution is more than connecting a generator to a building panel. Engineers and facility teams must define which loads receive power, how sources transfer, and what review applies to the installation. We build new switchgear and UL 891 switchboard assemblies to project requirements, with configuration, availability and delivery timing confirmed for each order.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Start with the load classifications

A useful design begins with a clear inventory of loads and the consequences of losing each one. Identify which circuits are required for life safety, which support critical operations, and which can be shed or restored later. The applicable codes and project criteria determine formal classifications; do not assume that a facility’s internal labels satisfy those requirements. Have the electrical engineer reconcile the load schedule with the governing code, occupancy, and authority having jurisdiction.

For each load group, document voltage, phase, estimated demand, starting characteristics, and whether it must operate continuously or intermittently. Note motor loads, elevators, pumps, controls, and sensitive electronic equipment that may affect source sizing or transfer behavior. This information helps establish how emergency power should be divided and what switchboard sections, breakers, and controls may be needed.

Define source and transfer arrangements

The one-line diagram should show normal and emergency sources, transfer equipment, distribution sections, bypass provisions if required, and the destination of each load group. Clarify whether transfer is open or closed transition, automatic or manual, and whether separate transfer switches or integrated equipment are specified. These decisions affect the assembly layout and coordination with generators, utility service equipment, and downstream panels.

A transfer device does not create additional source capacity. The engineer must evaluate generator capability, step loading, motor starting, voltage and frequency response, and any required load sequencing. Identify who furnishes the generator, transfer switches, protective devices, controls, and interconnecting conductors. Establishing these boundaries early helps avoid gaps between switchboard scope and other equipment packages.

Coordinate protection and operating priorities

Emergency systems need a protection strategy that accounts for both available sources and the distribution path. Provide the engineer’s assumptions for fault current, protective-device ratings, selective coordination where required, and ground-fault protection. Confirm that breaker types, trip functions, and settings can be coordinated with upstream service equipment and downstream devices. Final selection and settings depend on the project’s study and review, not on a generic switchgear configuration.

Operating priorities also deserve attention before equipment is released. Specify which loads are shed first when emergency capacity is limited, how and when they may be restored, and what indications operators need to distinguish source status, transfer position, and alarms. Control power, communications interfaces, and remote monitoring requirements should be assigned clearly so they can be incorporated and tested as part of the complete system.

Resolve the switchboard scope

For a UL 891 switchboard assembly, identify the intended service and distribution functions, enclosure requirements, incoming and outgoing arrangements, metering, and any required barriers or compartments. UL 891 applies to switchboards; it is not a blanket listing for medium- or high-voltage switchgear. State the specified equipment type and standard for each part of the system, and have the engineer confirm suitability for the application.

Custom-built configurations can address project-specific feeder counts, section arrangement, access, and interface needs. Drawings should establish dimensions, cable entry and exit, bus connections, neutral and grounding provisions, and space or provisions for future work when applicable. American-made components and short lead times may support procurement planning, but component selection, availability, and schedule depend on the defined scope and are confirmed for each order.

Prepare for review and handoff

Before fabrication, align the one-line, load schedule, equipment specifications, control narrative, and responsibility matrix. Confirm who supplies and installs each transfer device, how field wiring terminates, and what documentation is expected for coordination and commissioning. Engineering review and approval by the authority having jurisdiction remain project-specific; equipment selection alone does not establish code compliance or approval.

For a Georgia project, include the delivery destination, site receiving constraints, required arrival window, and whether unloading or access limitations affect shipment planning. Nationwide shipping is available, while exact routing and timing are confirmed for the order. Share the latest drawings, review status, and any schedule milestones so procurement and the project team can plan around the actual equipment scope.

Information to provide for a quote

A focused quote request should include the one-line diagram, load and feeder schedules, source data, applicable specifications, required standards, and anticipated quantity. Add breaker requirements, metering and control details, enclosure and environmental conditions, cable termination preferences, and any dimensional limits. Identify open design questions rather than making assumptions; unresolved choices can be flagged for engineering coordination before the configuration is finalized.

Also provide the project location in Georgia, requested delivery timing, drawing and approval milestones, and the names or roles responsible for engineering and procurement decisions. We can use those details to define a new switchboard or switchgear scope and confirm configuration, component availability, and schedule for the order. Begin with the current one-line and load classification schedule so transfer paths and emergency priorities are clear from the first review.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.