Data Center Switchgear

Data center teams must coordinate electrical distribution with uptime targets, maintenance procedures, and changing IT loads. We manufacture and supply new switchgear and UL 891 switchboard assemblies for projects in Georgia and nationwide. Early decisions about system topology, equipment boundaries, and expansion space help engineers specify a configuration that fits the facility’s actual operating plan.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Translate uptime goals into a distribution plan

Redundancy starts with the one-line diagram, not a label on an equipment lineup. Define the normal and alternate sources, the loads each source must support, and how the system transfers between operating states. Engineers should establish whether redundant paths remain electrically independent through the switchgear, downstream distribution, and any shared bus or connection points. The arrangement must match the facility’s operating and reliability objectives.

For a quote, share the current one-line, source and feeder details, required bus arrangements, protective-device schedule, and project operating scenarios. Identify which loads are critical, how much capacity each path must carry, and whether operators need manual or automatic transfer provisions. These details let the equipment configuration be evaluated against the intended architecture without assuming a particular data center design.

Design for planned maintenance

Maintenance requirements shape lineup layout and operating procedures. Decide which sections must be isolated while other portions remain energized, and identify the switching steps technicians will follow. Consider access to devices, cable terminations, control wiring, and test points, as well as the clearance and working space established by the project design. Isolation and bypass provisions, where needed, should be considered with the full system sequence rather than added as a late equipment detail.

Coordinate equipment divisions and connections with the engineer responsible for protection and the facility’s maintenance team. Confirm how breakers or other specified devices will be removed, tested, or replaced, and what provisions the operating plan requires for lockout and verification. Qualified personnel must perform installation and service under approved procedures. Final equipment selection and application require engineering review and acceptance by the authority having jurisdiction.

Make room for load growth

Data center demand can change as IT capacity, cooling systems, and support loads develop. Ask the design team to distinguish initial demand from projected buildout and to document the assumptions behind both. Future capacity may call for reserved spaces, bus capacity, feeder provisions, or a lineup arrangement that permits planned expansion. Each option has physical, electrical, and cost implications, so reserve capacity should be deliberate rather than an unspecified allowance.

Provide anticipated phase loads, growth stages, future feeder counts, and any limits on equipment footprint or access. Also identify whether later work must occur beside operating equipment and what outage windows the facility can support. These constraints affect how a custom configuration can be built and how the project team plans future tie-ins. Any proposed expansion method must be checked against the final design and operating procedures.

Set clear equipment boundaries

A data center electrical package may include service or distribution switchboards, switchgear, transfer equipment, and downstream assemblies. The project documents should state which equipment is included in the manufacturer’s scope and where responsibility passes to other suppliers or contractors. Specify voltage, phase, frequency, continuous current, available fault information, enclosure and environmental conditions, entry direction, and connection requirements. The engineer of record must establish and verify ratings for the application.

UL 891 applies to switchboard assemblies; it is not a blanket listing for medium- or high-voltage switchgear. Identify the equipment type and applicable requirements for each part of the project, and confirm the required documentation and approvals with the design team and authority having jurisdiction. We build new equipment to the agreed scope, with configuration, component availability, and schedule confirmed for each order.

Coordinate procurement and delivery in Georgia

Procurement depends on complete, coordinated information. Share approved drawings when available, project specifications, device and metering requirements, control schematics, cable or bus connections, and any site-specific labeling or documentation needs. Identify submittal milestones, required review cycles, and the date equipment must be available for installation. We use American-made components where specified and confirm component availability and the achievable schedule against the exact configuration.

For Georgia delivery, provide the site location, receiving contact, access restrictions, unloading arrangements, and any sequencing or storage constraints. Data center projects may require equipment to arrive in a particular order or fit a defined route into the electrical room. Nationwide shipping supports projects across Georgia, but delivery timing and handling details are confirmed for each order; the contractor and site team should coordinate receipt and placement.

Prepare a usable project handoff

Before release, compare the equipment drawings with the latest one-line and project requirements. Resolve feeder quantities, device functions, bus connections, control interfaces, dimensions, and access clearances through the responsible engineering and construction teams. Establish how field changes will be reviewed and recorded. Clear document control helps prevent a mismatch between the specified redundancy strategy and the equipment installed at the site.

To begin a data center quote, send the one-line diagram, specification, load and growth assumptions, equipment scope, project location, delivery needs, and target milestones. Note maintenance and transfer requirements, known constraints, and open design decisions. We can review the requested configuration and confirm scope, component availability, and schedule for the order. Ask the project engineer to resolve ratings and approvals before equipment release.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.