New electrical distribution equipment, built around your projectServing Georgia
Three gray electrical switchgear cabinets on pallets, with a door swung open.

Applications

Cold Storage Facility Switchgear

Cold-storage power interruptions can threaten product temperature, disrupt refrigeration cycles, and complicate recovery. Facility engineers and contractors planning a new or expanded site need switchgear arranged around compressor and condenser loads, defrost operation, and the actual sequence of the refrigeration system. We build new switchgear and UL 891 switchboard assemblies to project requirements, with scope and delivery timing confirmed for each order.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Start with the refrigeration load profile

A cold-storage one-line should distinguish compressor motors from condenser fans, evaporator fans, pumps, dock equipment, lighting, and other facility loads. Identify each motor’s voltage, horsepower, full-load current, starting method, and operating sequence. Multiple compressors may start together after a disturbance unless controls stagger them; the resulting demand and voltage effects can influence feeder, bus, and protective-device decisions. Share the refrigeration equipment schedule and control narrative rather than relying on a single building load total.

Operating conditions matter as much as nameplate data. Ask the refrigeration engineer which units run continuously, which cycle with demand, and which loads are available as standby or lead-lag equipment. Note planned expansion, seasonal operating patterns, and any future compressor additions. These details help establish how the switchboard should divide and serve loads, while final ratings and protection require project engineering based on system data and applicable authority review.

Coordinate defrost without creating avoidable peaks

Defrost strategy affects electrical demand and operating sequence. Electric defrost heaters can create a substantial scheduled load, while hot-gas defrost places different demands on compressors, valves, and controls. Provide heater circuits and ratings, the number of evaporators, defrost duration and timing, and whether zones defrost in rotation. The design team can then assess how these loads align with compressor operation and other facility demand instead of treating defrost as an incidental accessory.

Confirm which system controls initiate and supervise defrost, what signals the switchgear or distribution equipment must provide, and how operators identify a circuit that is unavailable. Control interlocks and sequencing should be defined with the refrigeration controls engineer; switchgear alone does not determine a safe operating sequence. Where defrost schedules may change, document the intended operating envelope and review whether the distribution arrangement can accommodate the revised demand.

Plan for continuity and recovery

Temperature-sensitive operations need a clear response to loss of a source, feeder, or refrigeration component. Identify any generator, alternate source, transfer equipment, or load-shedding sequence in the project scope, including which refrigeration loads are prioritized and which may be delayed. Share source characteristics, available fault-current information, transfer philosophy, and control interfaces early. These inputs support coordination across switchgear, standby power, refrigeration controls, and facility operations; they do not imply that a particular continuity outcome is guaranteed.

Recovery after an interruption deserves its own sequence review. Restarting all compressors and fans at once may create a demand surge or interfere with orderly system stabilization. Establish with the refrigeration and electrical engineers how restart delays, lead-lag selection, alarms, and operator actions are intended to work. Document expected modes for normal operation, source transfer, maintenance, and restoration so procurement scope reflects the facility’s real operating plan.

Specify an arrangement operators can use

For a new switchboard, define incoming source arrangement, voltage, bus and feeder requirements, enclosure location, cable entry, and the destinations of refrigeration circuits. Grouping and labeling should make it practical for qualified personnel to identify compressor, condenser, evaporator, and defrost feeders from current drawings. Consider access, working clearances, moisture exposure, washdown practices, ambient conditions, and the route from electrical room to equipment when establishing the enclosure and installation requirements.

UL 891 applies to switchboard assemblies, not as a blanket listing for medium- or high-voltage switchgear. State the intended equipment type and the applicable project requirements explicitly. Protection, short-circuit ratings, selective coordination, grounding, arc-flash evaluation, and code compliance depend on the engineered system and review by the responsible professionals and authorities. Confirm the exact assembly scope and documentation needed before the order is finalized.

Prepare a quote package and delivery plan

For a useful quote, provide the one-line diagram, load and motor schedules, refrigeration sequence, defrost details, source and fault-current data, desired equipment ratings, enclosure conditions, and required control or metering interfaces. Include site constraints such as room dimensions, equipment access, conduit or busway entry, and planned energization phases. Identify who will approve drawings and resolve technical questions, plus any project submittal or documentation requirements.

We manufacture new switchgear in the United States using American-made components and can build custom configurations; exact component scope, availability, and schedule are confirmed for each order. For Georgia projects, share the delivery address, receiving hours, unloading capability, site access limits, and the date equipment must coordinate with construction milestones. Nationwide shipping can be arranged, with delivery planning based on the specific order and site conditions.

Close the handoff before energization

Before release to production, align the approved drawings with refrigeration controls, feeder identification, source-transfer interfaces, and the facility’s intended defrost and restart sequences. During project handoff, confirm who supplies field wiring, control programming, installation, testing, and commissioning, and make sure current drawings and equipment documentation reach the responsible teams. Installation, service, and energization should be performed only by qualified personnel under the project’s approved procedures.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.
Request a Quote