New electrical distribution equipment, built around your projectServing Georgia
Gray electrical switchgear with meters and breaker controls inside an open enclosure.

Protection

Arc Flash Relays

Arc-flash relay schemes combine fast detection with a trip decision tailored to the equipment and protection system. For Georgia engineers, contractors and facilities teams, choosing between light-only and light-plus-current sensing starts with the hazard, system layout and existing breakers. A clear specification also sets expectations for coordination, testing, switchboard integration and project handoff.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

How sensing methods differ

A light-sensing relay monitors optical energy at selected locations, such as switchgear compartments or bus zones. Fiber-optic sensors can cover a defined area, while point sensors focus on particular spaces. Light-only detection can act quickly, but it must be engineered to distinguish an arc event from ordinary illumination, maintenance lighting or other optical exposure. Sensor placement and coverage are therefore central design decisions.

A combined light-and-current scheme requires both an optical signal and a current condition that meets the relay’s programmed criteria. This can help reject light events that are not accompanied by fault current, but it depends on appropriate current inputs and settings. A current-only approach may be considered in some designs, though it does not provide the same direct optical indication. The choice depends on the application, protection philosophy and relay capabilities.

Define the protected zones

Identify the equipment and compartments the scheme is intended to cover: incoming sections, bus compartments, feeder cubicles, or other accessible zones. Provide one-line diagrams, switchgear or switchboard arrangement drawings, breaker locations and available compartment details. These help the engineering team assess sensor coverage, relay locations, wiring paths and which protective devices can receive a trip command.

Clarify whether the project is new construction, replacement equipment or an addition to an operating lineup. Existing enclosure geometry, barriers, cable routing and control-power availability can constrain sensor installation. For a new assembly, define the intended zone boundaries and interfaces early. A sensor arrangement should be reviewed against the actual equipment design rather than assumed from a generic lineup description.

Coordinate sensing with protection

A relay’s trip output is only useful if the selected breaker can interrupt the relevant fault and the trip circuit is correctly integrated. Share breaker types, trip-unit or protective-relay information, control voltage, auxiliary-contact requirements and available trip inputs. The engineer must determine how the arc-flash function interacts with overcurrent protection, interlocking, bus differential or other schemes, including whether a zone-selective or maintenance mode is part of the design.

Ask how the proposed logic behaves for a sensor alarm, loss of sensor continuity, relay self-supervision issue or loss of control power. Confirm whether the design uses separate alarm and trip outputs, latching, reset requirements or event records. Settings and logic must be reviewed with the system study and operating procedures; neither a fast trip claim nor a device setting alone establishes the protection performance of the complete installation.

Specify testing and acceptance

Include relay model and options, sensor type and quantity, zone map, current-input sources, trip destinations, control-power details and required communications in the project specification. State which drawings and setting files are needed for review, and identify acceptance-test responsibilities. Where applicable, request documented checks of sensor response, relay logic, alarm functions, trip-output operation and end-to-end paths to the intended breaker or test interface.

Factory testing can verify the supplied assembly and agreed functions, while field commissioning must confirm the installed sensors, wiring, settings and trip circuits in the actual system. Define test methods, safe isolation arrangements, expected records and who will witness or approve each stage. Testing scope should be agreed before order release; it should not be assumed that every requested field activity is included with equipment supply.

Plan procurement and handoff

For a quote, share the project location in Georgia, equipment type and quantity, voltage and bus information, one-line diagram, lineup dimensions, protection documents and the desired sensing approach if already selected. Include required standards, drawings, submittals, delivery sequence and any site access or receiving constraints. If details are unresolved, identify the decision owner and the date those inputs can be provided so the scope and schedule can be evaluated realistically.

We manufacture and supply new switchgear and UL 891 switchboard assemblies in the United States, with custom-built configurations, American-made components and nationwide shipping. UL 891 applies to switchboards, not as a blanket listing for medium- or high-voltage switchgear. For Georgia delivery, coordinate the destination, unloading responsibility, shipment sequence and required documentation with the project team. Exact equipment scope, component availability and timeline are confirmed for each order.

Close the engineering loop

Before release, have the responsible engineer reconcile the sensor-zone drawings, relay logic, settings, breaker trip interfaces and test plan with the current one-line and protection study. Resolve open questions about maintenance modes, alarms, control-power failure behavior and commissioning access. Changes to breaker selection, compartment construction or wiring after design review can affect the scheme and may require revised drawings or testing.

For a practical starting package, send the one-line, equipment layout, existing relay and breaker data, preferred light or combined sensing concept, and acceptance-test expectations. Identify what remains unknown instead of filling gaps with assumed ratings or settings. This gives the manufacturer and project engineer a defined basis to review the configuration, clarify interfaces and plan delivery to the Georgia site.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.
Request a Quote