35-kV Switchgear Specifications

For Georgia engineers, contractors, and purchasing teams, specifying equipment for a 35-kV system starts with confirming the system’s actual voltage conditions—not simply matching a nominal number on a drawing. This guide explains when 38-kV-class equipment may apply, which ratings and interfaces need engineering review, and what information helps scope a new switchgear order.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Start with the system voltage basis

A 35-kV designation commonly identifies a system’s nominal operating voltage. It does not, by itself, define the maximum voltage equipment must withstand or establish which product class is suitable. Engineers should confirm the system’s nominal and maximum operating voltage, grounding method, frequency, and expected operating conditions before selecting equipment. The project’s one-line diagram and utility or facility criteria provide the starting point for this review.

38-kV-class equipment may be applicable to a 35-kV system when its published ratings and construction match the project requirements. That relationship is not automatic: equipment selection depends on the applicable voltage ratings, insulation levels, switching duties, and system conditions. The engineer of record should verify the class and ratings against the project design and the requirements of the authority having jurisdiction.

Separate voltage class from other ratings

Voltage class is only one part of a switchgear specification. Define continuous current, short-circuit withstand or interrupting requirements as applicable to the equipment type, and the duration associated with fault-current withstand. Include the available fault current at the proposed installation point and the protective-device clearing assumptions used in the study. Those values must be coordinated; a voltage-class match cannot compensate for inadequate current or fault-duty ratings.

Also identify required basic insulation level and other dielectric test criteria, clearances, and environmental conditions. Elevation, ambient temperature, indoor versus outdoor exposure, contamination, and condensation can affect equipment selection and construction. Avoid requesting a rating from a prior project without checking that the same system and installation assumptions apply. Final ratings and construction require engineering review of the current project documents.

Define the switching arrangement

The one-line diagram should show how incoming sources, bus sections, feeders, transformers, and tie points connect. Specify the number and function of compartments, the intended operating sequence, and any interlocking or remote-control requirements. Identify whether the design calls for metal-enclosed switchgear, a particular switching device, or another equipment arrangement; terminology can vary between project teams, so describe the required function rather than relying on a label alone.

Protection and control details need equal attention. Share relay functions, instrument-transformer requirements, control-power source, metering needs, trip and close circuits, communications interfaces, and any required external connections. State which devices and wiring are included in the requested assembly and which are furnished by others. These boundaries help avoid gaps between the switchgear scope, protection design, and site integration.

Check interfaces and installation constraints

Room plans and cable details affect the equipment configuration. Provide available floor space, access and maintenance clearances, cable entry direction, termination preferences, conduit or trench locations, and any limits on shipping sections. Identify bus connections to transformers or adjacent equipment, phase arrangement, grounding provisions, and the required point of connection. Drawings should be coordinated across the electrical, structural, and civil scopes before fabrication details are finalized.

For a new manufacturer-built assembly, distinguish the equipment requirements from field-installed work. Confirm responsibility for foundations, external cable terminations, grounding connections, control wiring, testing, and commissioning. Installation, testing, and energization should be performed by qualified personnel under the project’s approved procedures. Engineering and the authority having jurisdiction must review the final design and installation; a product description alone does not establish code compliance or suitability.

Prepare a useful Georgia quote request

For a quotation, provide the one-line diagram, equipment schedule, voltage and current ratings, fault-duty study data, protection and control requirements, and applicable project specifications. Include the system grounding method, environmental conditions, enclosure requirements, cable and bus interfaces, and requested drawings or submittals. Flag any open decisions rather than allowing assumptions to become hidden requirements. The manufacturer can then review the requested configuration and identify details that need clarification.

For a Georgia project, include the delivery city or site, receiving access, unloading arrangements, delivery restrictions, and any required delivery window. Nationwide shipping is available, but the route, packaging, shipment scope, and schedule are confirmed for each order. Confirm the equipment scope, availability, and timeline against the final documents before release; custom configuration and component selection can affect the order plan.

Close the specification before release

Before authorizing fabrication, reconcile the approved one-line, equipment schedule, ratings, compartment layout, control drawings, and interface list. Resolve discrepancies in voltage class, fault duty, cable entry, or protection scope in writing. Verify that the selected 38-kV-class equipment, if used, satisfies the engineer’s requirements for the actual 35-kV system and that every required device and connection is represented in the approved submittal.

The practical next step is to send the project’s current design package with the site and delivery constraints, then ask the manufacturer to quote the defined new assembly and identify unresolved assumptions. This creates a clearer handoff from system design to equipment configuration, procurement, and site coordination. Keep engineering approval and authority review in the project workflow before installation or energization.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.