New Replacement Switchgear for Modernization Projects

Modernization can introduce new distribution capacity, protection and control functions while a facility transitions away from aging equipment. We manufacture and supply new replacement switchgear and switchboards for those projects; we do not conduct the field modernization. The owner’s qualified engineers and contractors assess the installation, define the sequence and perform the site work, while the equipment order captures the requirements for each new assembly.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Turn modernization goals into an equipment scope

A modernization program may be driven by obsolete protective devices, expanding loads, unreliable controls, a changed operating strategy or physical deterioration. Those concerns do not all require the same replacement boundary. A project may replace an entire lineup at once or procure new assemblies in phases while other equipment remains in service. Compare each option against expected service life, future expansion, outage constraints, available space and the risks of retaining older equipment.

The owner’s qualified project team should gather one-line diagrams, equipment schedules, studies, nameplate information, maintenance history and available drawings. Qualified personnel perform the field assessment and verify actual conditions under the facility’s safety procedures. Record gaps and conflicts rather than inferring condition or capacity from age alone. Their findings let the engineer identify which functions and interfaces each newly manufactured assembly must provide.

Design each phase around operating states

For a staged replacement, describe the normal, alternate and temporary system configurations that matter to each phase. Identify mains, ties, feeders, generators and transfer equipment, plus the circuits that must remain available during construction. The project engineer should define the phase boundaries and assess whether temporary connections or additional protection are needed; the contractor and owner are responsible for developing and executing the approved field sequence.

Translate that sequence into equipment requirements before ordering. For example, a new lineup may need reserved feeder positions, defined cable entry points, tie-breaker functions or provisions for a later control connection. State which capabilities are required in the initial shipment and which are planned for a future stage. A spare space or provision is not a promise that any future device will fit; its permitted use and ratings must be defined in the approved design.

Specify controls, metering and communications

A useful control narrative describes what the new equipment must do in each operating state. Identify local and remote control requirements, breaker status, alarms, metering, permissives and mechanical or electrical interlocks. Provide control-power source and voltage, terminal interfaces, loss-of-power behavior and any signals exchanged with generators, transfer switches or supervisory systems. If networked metering or controls are required, specify the protocol, point list and responsibility for system integration.

The manufacturer uses the agreed requirements to build the new assembly and supply relevant equipment drawings and documentation within the order scope. The project’s engineer reviews the operating logic and interfaces with retained systems; qualified site parties make field wiring changes and verify the integrated operation. A replacement panel or communication protocol by itself does not establish compatibility with every existing device or facility network.

Reassess electrical ratings and protection

Specify the system voltage, phase, frequency, grounding arrangement, continuous current and service environment for each new assembly. Supply available fault-current information and required short-circuit withstand or interrupting duties, along with main, tie and feeder device functions. Confirm the suitability of both the assembly and its protective devices for their respective duties. Loading changes and new sources can make the original equipment ratings or previous assumptions unsuitable.

Qualified electrical engineers should review protection settings and coordination using current source, transformer, conductor, motor and generator data as applicable. Define required studies and acceptance criteria in the project documents instead of copying old settings without review. Where the project requires an arc-flash assessment or updated labels, the responsible engineering and site parties determine and complete that scope under applicable requirements. The new equipment’s features support the design; they do not substitute for the system study.

Purchase a new assembly with verified interfaces

The new lineup must connect to the surrounding installation and fit the available route and room. Provide verified dimensions, working-clearance requirements, incoming and outgoing connection details, cable entry and termination space, bus arrangement, environmental conditions and any utility interface specifications. Where a new section must connect to retained gear, the project engineer and applicable parties must review physical and electrical compatibility, the retained equipment’s condition and any effect on listing or labeling; an apparent match is not approval.

We build and supply new equipment to the confirmed scope. Choose the equipment class and standards for the actual application: UL 891 concerns switchboards and is not a blanket listing for medium- or high-voltage switchgear. Verify any required listing or labeling for the specific proposed assembly and configuration. Define drawings, factory inspection and production testing, witness points and delivery requirements in the order; factory activities are distinct from field acceptance tests.

Hand off for field execution and future phases

The owner’s qualified project parties perform field inspection, installation, modifications, maintenance, field testing, commissioning and energization, including any removal and integration of retained systems. They control isolation, electrical safety and the approved outage sequence. Our role is to manufacture and supply the new replacement equipment, not to provide those field services. Align delivery with the receiving party’s unloading, storage, access and construction plans; dates and logistics depend on the confirmed order.

For a Georgia quote request, provide the latest one-line, equipment and device schedules, verified site interfaces, control narrative, study requirements, desired phase boundaries, delivery location and target schedule. Identify open decisions and who will review the submittals. After each stage, the project team should retain as-built drawings, field test results, protection settings and operating instructions so that the next phase is designed against the system as actually installed.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.