Start with the connected-load inventory
Connected load is the sum of the electrical loads shown as connected to a system or section, using the applicable nameplate or design values and consistent units. Build the inventory by panel, feeder, voltage and phase, and identify motors, heating, lighting, receptacles, electronic loads and planned additions separately. Record ratings and operating characteristics rather than relying on equipment descriptions alone.
An inventory is not automatically the capacity required for the switchboard. Some listed loads may not operate at the same time, while others have operating cycles, starting behavior or special operating modes that affect the design. Identify standby and redundant equipment, transfer schemes, future loads and any load that is intentionally shed. Confirm whether listed values are input power, output power, current or a preliminary estimate.
Apply demand with documented assumptions
Demand load represents the load expected under the operating conditions and calculation method applicable to the project. It may be below the connected total when the governing code provisions, engineering analysis or documented operating profile supports a diversity factor. Do not apply a general percentage simply because all equipment is unlikely to run at once; the basis must fit the loads, system and applicable requirements.
Ask who established the demand calculation and which code edition, utility criteria, operating scenarios and assumptions it uses. Check whether the calculation covers normal operation, peak production, seasonal conditions, emergency operation or other relevant cases. A demand value is meaningful only alongside its scope and rationale. Keep calculation worksheets and load schedules aligned so the equipment specification reflects the same scenario reviewed by the engineer and authority having jurisdiction.
Separate continuous loads from other loads
A continuous load is generally one expected to continue at its maximum current for three hours or more, subject to the applicable electrical code definition and project review. Examples can include some lighting, process heating or ventilation loads, but the duty cycle and actual operating sequence matter. A load that sounds continuous by name is not necessarily classified that way without reviewing its expected operation.
Continuous-load treatment can affect conductor and overcurrent-device calculations under applicable rules; it should not be handled by simply adding a blanket margin to the switchboard bus. The engineer must determine the required calculation and ratings for each circuit and assembly. Distinguish continuous loads in the schedule, state expected hours and operating conditions, and flag equipment that cycles, runs intermittently or operates continuously only in certain modes.
Translate the calculation into equipment requirements
After the loads are reconciled, the design team can establish required system voltage, phase, wire configuration, bus and feeder arrangement, incoming source details, protective-device needs and space for specified future circuits. Capacity is not just a single ampere number: the switchboard configuration must suit the calculated load, available fault current, service or distribution role and the project’s coordination and operating requirements. These are engineering decisions, not assumptions to infer from a preliminary total.
For a new UL 891 switchboard assembly, identify the intended application and the design information needed to confirm the assembly scope. UL 891 applies to switchboards; it is not a blanket listing for medium- or high-voltage switchgear. Where the project includes other equipment or voltage classes, specify them distinctly and have the responsible engineer establish the applicable standards and review. Confirm the required documentation and boundaries before procurement.
Prepare a useful quote and handoff
For a quote, share the current one-line diagram, load schedule and calculation basis, plus voltage, phase, incoming source, required bus capacity, feeder and breaker details, enclosure and installation conditions, and any known fault-current or coordination information. State which values are preliminary and which have engineering approval. Include the operating scenarios behind demand assumptions, continuous-load identification, future-load allowance and any constraints on dimensions, access or cable entry.
Georgia delivery planning should follow the project’s actual site and sequence: provide the delivery location, receiving constraints, required ship-to details and target need date, then confirm availability and schedule for the specified configuration. Before release, reconcile the approved calculations with the final one-line, protective-device schedule and switchboard submittal. Ask the engineer to resolve discrepancies, then send the confirmed requirements for manufacturer review so the ordered new assembly matches the project basis.