Locate the interconnection point
Start with the approved or developing one-line diagram and identify where the PV source connects: on a facility bus, at a dedicated switchboard section, or through a separate interconnection assembly. The point of connection determines which conductors, breakers, metering provisions, and isolation functions belong in the switchgear scope. Clarify whether the assembly serves a new installation, an expansion, or a replacement in an existing distribution system.
Document the sources and loads that can energize the relevant bus, including utility service, PV inverters, generators, and battery systems where present. Show normal and alternate operating paths, existing equipment boundaries, and the intended point of utility ownership or control. These details help distinguish the interconnection assembly from adjacent service or distribution equipment and expose interface questions before fabrication.
Check backfeed and bus limits
PV power can flow toward the utility or into facility circuits, so an interconnection review must account for more than the nominal inverter output. Engineers should compare source contributions and operating conditions with the bus, breaker, conductor, and equipment ratings specified in the design. The allowable connection method and any limits on backfeed depend on the actual arrangement and applicable engineering review; do not assume an existing switchboard can accept a new source simply because a breaker position is available.
For a quote, provide the planned inverter output and quantity, system voltage and phase, service and bus ratings, proposed connection location, and any export or non-export requirement. Include the method intended to enforce a limit, such as a control scheme identified by the project engineer, rather than treating a switchgear breaker as an automatic export controller. The manufacturer can configure the assembly to the defined scope, while the project team establishes and validates the system-level operating limits.
Define protective functions and settings
Protection coordination should address the utility source, PV source, facility loads, and other generation that may affect fault current or clearing behavior. Identify the proposed protective devices, trip functions, current-sensing arrangement, and setting responsibility in the design documents. Relay, breaker, or inverter protection settings must be developed and reviewed for the specific system; a switchgear quote should not substitute for a coordination study or imply settings are known before engineering review.
Share available fault-current information, protective-device data, grounding details, and the latest coordination or protection requirements relevant to the connection. Confirm which components are included in the manufacturer’s assembly and which controls, relays, metering, or field wiring are furnished by others. Clear scope boundaries support accurate procurement and reduce the risk of mismatched interfaces during installation and commissioning.
Resolve utility and Georgia project criteria
Utility interconnection requirements can affect disconnecting means, access, visible isolation, metering, protection, documentation, and acceptance testing. Requirements vary by serving utility and project conditions, so identify the utility, service location, application status, and applicable written criteria. Where a utility or authority has issued comments or equipment requirements, include those documents in the design package for review rather than relying on a general assumption about Georgia practice.
Coordinate utility review with the electrical engineer, owner, contractor, and other parties responsible for approval. Confirm whether the proposed arrangement has been accepted, remains subject to review, or requires a revised one-line diagram. UL 891 applies to switchboard assemblies within its scope; it does not establish utility acceptance or provide a blanket listing for medium- or high-voltage switchgear. Equipment type and applicable standards must be confirmed for the specific project.
Specify the build and project handoff
A useful quote package includes the one-line diagram, equipment schedules, available layout or dimensions, electrical ratings, device and control requirements, utility criteria, and the desired delivery location in Georgia. State the required enclosure and access arrangement, cable entry direction, incoming and outgoing conductor details, and any environmental or installation constraints. Identify existing equipment interfaces and provide photographs or field measurements when an assembly must fit a defined space; final dimensions and interfaces require project review.
Ask which drawings, submittals, and factory documentation are included, what information remains open, and when the project team must release approved documents to support fabrication. Share the required on-site date and delivery constraints early; exact configuration, availability, and schedule are confirmed for each order. Georgia delivery can be coordinated to the project destination, but receiving access, unloading responsibility, and site readiness should be planned with the contractor and purchasing team. Before requesting a quote, send the one-line diagram, utility criteria, backfeed objective, protection information, and delivery needs so the proposed scope can be evaluated against the actual interconnection.