Primary and Secondary Selective Distribution

Georgia engineers, contractors and facility teams weighing selective distribution need to compare more than the location of a transfer switch. Primary and secondary arrangements place source selection at different points in the power path, changing which equipment must operate during an outage and how much coordination the design requires. This guide frames the tradeoffs for specification and procurement.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Where source selection occurs

A primary selective system selects between utility or other approved sources on the higher-voltage side of the transformers. Switching may be performed by medium-voltage equipment feeding one or more transformers, with downstream low-voltage switchboards receiving power from the selected path. The arrangement can keep the transfer function upstream, but it does not automatically provide a separate alternate source to every load.

A secondary selective system places source selection on the low-voltage side. Two transformers typically feed separate switchboard sections connected by a tie breaker, with a defined operating scheme for normal and alternate supply. The tie can let one source support both sections when the other source or transformer is unavailable, subject to source and equipment capacity. The actual topology depends on the utility service and project design.

Compare flexibility at the point of failure

Primary selection can simplify downstream distribution when the project can transfer a transformer’s input as a unit. This may suit a facility where loads are grouped by transformer and interruption during transfer is acceptable under the operating plan. The tradeoff is that an upstream switching action can affect a broader portion of the distribution system, and the available alternate path must be evaluated through the transformer and its connected equipment.

Secondary selection can offer more sectional control: a failed source or transformer may be isolated while the tie supplies the affected section from the remaining source. That flexibility is conditional, not unlimited. Engineers must establish which loads can transfer, whether transfer is open or closed transition, and whether the alternate source can carry the transferred demand. Closed-transition operation also requires specific utility and protection review; it should not be assumed from the presence of a tie breaker.

Account for equipment and control scope

Primary selective designs concentrate switching complexity in medium-voltage gear, including the selected source arrangement, protective devices, controls and interlocks appropriate to the engineered scheme. Secondary selective designs generally add low-voltage tie and section equipment, associated metering and control logic, and space for a divided lineup. Neither approach is inherently simpler in every project: equipment count, voltage class, fault duty, maintainability and the required transfer sequence all affect scope.

For a new UL 891 switchboard assembly, confirm that the specified assembly scope and construction are appropriate to the project. UL 891 applies to switchboards; it is not a blanket listing for medium- or high-voltage switchgear. Keep the medium-voltage source equipment and the low-voltage switchboard clearly distinguished in the one-line diagram, equipment schedule and procurement package. Ratings and certification scope must be confirmed for the actual proposed equipment, not inferred from the system label.

Resolve operating and protection assumptions

Before selecting an arrangement, document normal source configuration, alternate-source availability, transformer sizes and impedances, load profile, expected demand, and the loads that must remain energized. Ask the engineer to define breaker operating sequence, permissives, mechanical or electrical interlocking, automatic versus manual transfer, and response to a breaker that fails to open. Specify whether interruption is acceptable and how the system returns to its normal state after the source is restored.

Protection coordination and available fault current can distinguish a workable concept from one that needs revision. Review the utility’s source characteristics, grounding method, transformer data, protective-device settings and the effect of tying sections together. A tie changes the paths that can feed a fault and may change the duty seen by equipment. Final ratings, settings and operating procedures require engineering review and the applicable authority’s review; a generic selective scheme is not a substitute for that work.

Make procurement and handoff specific

For a quote, share the current one-line diagram, source voltage and service details, transformer information, load schedule, desired transfer behavior, and preliminary equipment ratings. Identify which components are manufacturer-furnished, which are by others, and whether the requested scope includes a UL 891 switchboard assembly, controls, metering or interconnection provisions. Also provide dimensions, access constraints, indoor or outdoor application, and the project schedule so configuration and availability can be checked for the order.

At handoff, align the approved drawings, equipment labels, control narrative, breaker settings responsibility and field connection boundaries among the engineer, contractor, utility and facility operator. Georgia delivery can be coordinated to the project site or receiving plan, with shipment timing and scope confirmed for the specific order; do not assume a local office or fixed lead time. Before release, ask the design team to confirm the preferred selection point, transfer sequence and load limits, then send that documented basis with the equipment request.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.