Electrical Shock and Arc Flash Boundaries

Electrical shock approach boundaries and the arc flash boundary address different hazards, so they should not be treated as interchangeable distances. Georgia engineers, contractors, and facility teams can use this guide to coordinate equipment specifications, field labels, and safety procedures while planning new switchgear for a project.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Two hazards, two boundary purposes

Shock boundaries control approach to exposed energized conductors or circuit parts. The limited approach boundary restricts entry by unqualified persons unless permitted safeguards and supervision are in place. The restricted approach boundary applies closer to the hazard and requires qualified-person practices, including appropriate shock protection and work controls. Applicable standards and the employer’s electrical safety program determine how these restrictions are applied.

The arc flash boundary marks the distance at which incident energy is calculated to reach the applicable threshold for a second-degree burn under the assessment method used. It governs arc-flash risk controls, such as identifying who may enter and what protective measures are required. It is not a shock boundary, and it does not establish a universal safe working distance. A worker can be outside one boundary but inside another; both hazards must be evaluated for the task.

How boundaries are established

Shock approach distances depend on factors such as voltage, the equipment condition, and the task. The applicable electrical safety standard provides boundary requirements; a qualified person must determine which values apply to the installation and work activity. A switchgear manufacturer cannot infer the site’s shock boundaries from a purchase description or a nominal system voltage alone.

An arc flash study uses system information and a defined operating configuration to assess incident energy and the resulting boundary at specified equipment locations. Inputs can include available fault current, protective-device settings and clearing times, conductor and enclosure details, and operating modes. Utility changes, alternate feeds, maintenance settings, or equipment modifications may affect results. The boundary is therefore tied to the documented assumptions and study scope, not simply to a product name or enclosure size.

Specify equipment with the assessment in mind

For a new switchboard or switchgear package, share the one-line diagram, system voltage, available fault-current information, source and tie arrangements, and intended operating modes. Identify protective devices, trip units, metering, control power, and any requested maintenance or energy-reducing functions. These details help the engineering team review the proposed configuration and identify information needed to coordinate with the project’s electrical study.

Also clarify whether the purchase scope includes a UL 891 switchboard assembly, other equipment, or both. UL 891 applies to switchboards; it is not a blanket listing for medium- or high-voltage switchgear. Confirm the required equipment type, construction, ratings, and documentation with the project engineer and authority having jurisdiction. Do not assume that a requested label, rating, or feature is available or appropriate until the exact configuration is reviewed.

Labels and procedures belong together

Equipment labels should reflect the completed assessment and the installation’s applicable procedures. Arc-flash labels may communicate incident energy or an arc-flash boundary, along with other study-specific information. Shock warnings identify voltage-related hazards and approach limits. The project team should define label content, placement, and responsibility for producing and installing final labels; preliminary design data should not be mistaken for field-verified values.

Labels alone do not authorize work or replace an energized-work permit, job briefing, lockout/tagout, or other employer-required controls. Before a task, qualified personnel should verify the equipment identity and condition, review the current study and procedures, and determine whether equipment can be placed in an electrically safe work condition. Work near exposed energized parts requires the qualifications, protective equipment, and controls specified by the applicable rules and site program.

Coordinate procurement and Georgia delivery

For a quote, provide the equipment schedule, one-line diagram, required ratings, enclosure and access requirements, protective-device preferences, study assumptions available to date, and the project’s documentation and labeling expectations. Identify open design items and who will supply final fault-current data or study results. This makes it easier to review scope, flag dependencies, and confirm configuration, availability, and schedule for the specific order without treating preliminary estimates as final engineering values.

For Georgia projects, share the delivery location, site access constraints, receiving hours, unloading plan, and required-on-site date when requesting a proposal. Nationwide shipping can support delivery planning, but routing and timing depend on the confirmed order and shipment details. Before release and installation, coordinate approved drawings, protection settings, study updates, equipment identification, and handoff records among the manufacturer, engineer, contractor, and facility team.

Close the loop before work begins

A useful handoff identifies the equipment covered by the study, the operating configuration assessed, the source of final boundary and label values, and the person responsible for updating documents when settings or system conditions change. Procurement should confirm that the ordered configuration matches approved drawings; the project engineer should resolve discrepancies before installation or energization. Review changes through the site’s established engineering and safety process rather than carrying forward an unverified boundary.

Before requesting a quote, gather the one-line, equipment schedule, known system data, required assembly scope, and current study or labeling requirements. Ask which configuration details remain open, what documentation will be supplied, and how delivery to the Georgia site will be coordinated. Then have qualified engineering and safety personnel establish the applicable boundaries and procedures for the actual installation and work tasks.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.