New electrical distribution equipment, built around your projectServing Georgia
Rows of gray electrical switchgear cabinets on pallets in a large indoor space.

Manufacturing

Custom Switchgear Builds

Custom assemblies start with the conditions they must serve, not a standard lineup chosen by default. Georgia engineers, contractors and facilities teams can use this guide to define operating requirements, connected loads, available space and documentation before requesting a manufacturer-built switchboard or switchgear configuration. Clear inputs help resolve design questions and support a coordinated project handoff.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

Start with the operating conditions

Describe the electrical system the assembly will connect to and the role it must perform. Share system voltage, phase and frequency, source arrangement, grounding method, available fault-current information and whether the equipment is intended for service entrance or distribution. Identify normal operating conditions as well as planned generator, utility-transfer, tie-breaker or other source configurations. These details establish the design questions that must be resolved before components and enclosure arrangements are selected.

Explain the environment and operating practices that affect the build. Note indoor or outdoor placement, ambient conditions, dust or moisture exposure, access restrictions, maintenance clearances and whether operators need front access only or access from multiple sides. State how frequently breakers or switches are expected to operate and whether future expansion is part of the project. Engineering review can determine which requirements apply and what further information is needed; no rating or code suitability should be assumed from a general description alone.

Make the load schedule useful

Provide a current load schedule rather than a single total demand figure. For each feeder, identify its load type, voltage, phase, estimated or specified current, continuous-duty requirements and any known starting or inrush characteristics. Flag critical loads, large motors, sensitive electronic loads and circuits that must remain available during a source change. Include spare feeder needs and distinguish installed spare devices from spaces reserved for later additions, since these affect both cost and physical arrangement.

Ask the project engineer to identify the protection and metering functions required for each circuit. Breaker frame and trip requirements, adjustable settings, ground-fault functions, selective coordination objectives and monitoring points should be documented where known, then reviewed against system studies and project criteria. If settings depend on a short-circuit, coordination or arc-flash study that is still in progress, mark them as pending rather than presenting preliminary values as final. Confirm who will approve the final schedule and settings before release for manufacture.

Resolve space and interface constraints

Share dimensioned room plans, equipment elevations and the intended lineup location. Include door and corridor widths, floor loading limits if established, ceiling obstructions, housekeeping pads, cable trenches, overhead routing and the route from receiving point to the installation area. Note which side cable entry must use and whether conductors arrive from above, below or both. Those constraints influence section layout, cable landing space and access to terminations; late changes to any of them can require a revised configuration.

Coordinate the assembly with adjacent equipment and the building systems. Identify upstream and downstream gear, transformer or generator interfaces, bus connections, conduit stub-ups, grounding provisions and any controls or communications connections. Clarify whether the project requires a particular lineup footprint, compartment arrangement, finish, labeling convention or access orientation. For Georgia delivery, confirm the site address, receiving hours, unloading capability, delivery restrictions and planned installation window early. Shipping arrangements and timing are confirmed for the individual order, so avoid relying on an assumed delivery date before scope review.

Define the equipment and build scope

A custom request should distinguish required functions from preferred details. State the number and purpose of incoming, tie and feeder sections; the desired breaker or switch functions; metering and control needs; and any required provisions for future circuits. Identify the applicable equipment type and project specification, including whether the requested assembly is a low-voltage switchboard built to UL 891. That standard applies to switchboards; it should not be treated as a blanket listing for medium- or high-voltage switchgear. The manufacturer can review the stated scope and identify questions about the proposed equipment category.

List component preferences and approved substitutions, if the project documents permit them. American-made components may be requested, but the exact component selection and availability must be confirmed for the configuration. Also identify required labels, nameplates, control devices, terminal blocks and accessories. State which items are furnished by others and who is responsible for their installation or connection. A clear division of scope prevents assumptions about field wiring, controls integration or components that are not included in the manufacturer’s assembly.

Prepare documents for a coordinated handoff

For a quote, provide the one-line diagram, load schedule, project specification, available fault-current or study data, room and cable-entry drawings, and the required delivery location. Include the project schedule, requested submittal milestones and any known approval deadlines. Mark each document with its revision and status, and identify unresolved decisions. This lets estimating and engineering compare the same basis of design, flag missing inputs and distinguish firm requirements from items still under review.

Before production release, agree on the controlling drawing set and approval responsibilities. Confirm who reviews outline dimensions, connection details, breaker schedules, control diagrams, labels and any settings information. Record approved deviations and the disposition of open technical questions in the project documents. The next step is to send the current project package with the key electrical, spatial and delivery constraints identified; the manufacturer can then review the requested custom configuration, clarify scope, and confirm order-specific availability and schedule for the Georgia site.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.
Request a Quote