Define the feeder path
Start with a one-line diagram that identifies the switchboard supplying the section, the subfeed point, and the downstream panel or equipment. Show whether the lugs serve one feeder or multiple outgoing sets, where the conductors leave the enclosure, and whether the run continues in conduit, cable tray, or another arrangement. These details affect section layout and termination access.
Also identify the source bus and its electrical characteristics, along with the downstream load and expected operating conditions. The design team should establish system voltage, phase and wire configuration, available fault current, and the applicable project requirements. A subfeed lug connection is not itself a branch-circuit breaker; the protection and disconnecting arrangement must be defined elsewhere in the system.
Choose where protection belongs
The central design question is where the feeder overcurrent protective device will be located. It may be upstream in the supplying switchboard or at another point permitted by the project design and applicable requirements. Identify the device protecting each conductor set and show its rating and location on the one-line. Do not assume that adding lugs provides overcurrent protection or a local means of isolation.
If a feeder breaker or fused device is required within the switchboard lineup, specify that arrangement rather than requesting a lug-only section. Device placement changes the section function, available space, access, and wiring path. The engineer of record should review the protection scheme and governing requirements; final design and acceptance remain subject to engineering and authority review.
Confirm termination capacity
Provide the conductor material, quantity per phase and neutral, size range, insulation type, and any equipment grounding conductor details. State whether conductors enter from the top or bottom, the direction they must bend, and the intended lug orientation. If parallel conductors are planned, give the count and routing so the termination arrangement can be evaluated rather than inferred from a single wire-size note.
The usable termination space depends on the selected lugs, conductor dimensions, bending clearance, enclosure geometry, and access needed to install and torque connections. Include cable dimensions or the specified lug data when available, plus any required barriers or separation. Do not assume every conductor combination fits a standard section. Final capacity and layout are confirmed against the order-specific design.
Plan coordination downstream
Share the downstream protective-device schedule and available trip-unit or fuse information so the engineering review can consider coordination with upstream protection. Relevant inputs include device type, ratings, settings where established, and the system fault-current study. Coordination is a system-level evaluation; a lug section alone cannot establish selective operation or fault-clearing performance.
Also flag whether the downstream equipment serves critical loads, has multiple sources, or includes transfer equipment that affects the fault-current path. Identify any selective-coordination criteria or study requirements in the project documents. If settings or downstream devices are not yet selected, state what is preliminary and who will provide the final information. This helps prevent assumptions from becoming fixed in the switchboard arrangement.
Resolve lineup and project interfaces
A subfeed section must fit the lineup plan as well as the electrical scheme. Provide adjacent section functions, lineup sequence, bus arrangement, enclosure and access constraints, and any restrictions on overall width or installation location. Note whether the section is intended for a new lineup or an extension, and provide interface drawings when matching existing equipment is part of the scope.
For projects in Georgia, share the delivery location, site access conditions, receiving hours, and the required on-site date when requesting a quote. Nationwide shipping can be coordinated with the project schedule, but availability and timing are confirmed for each order. Confirm unloading responsibility, shipment access, and whether the route to the electrical room imposes size or handling limits.
Prepare a quote-ready submittal
A useful quote package includes the one-line diagram, load and feeder schedule, system voltage and fault-current information, conductor and lug requirements, protection details, lineup dimensions, and project specifications. Mark items that are confirmed, pending, or subject to engineering review. Include drawings of the downstream connection point and any installation constraints that could affect termination access.
Before release, review the proposed section function, lug arrangement, conductor entry, protective-device locations, and interfaces against the approved project documents. Submit those details with the Georgia delivery location and required schedule so the manufacturer can confirm scope, configuration, availability, and timing for the order. This focused handoff gives engineering and procurement a clear basis for resolving open decisions before fabrication.