For Georgia engineers, contractors and facility teams, metal-clad switchgear is defined by more than a lineup of breakers. Its drawout apparatus, grounded barriers and compartment arrangement affect operation, maintenance planning, room layout and procurement. This guide explains the features to specify, the project information needed for a quote, and how to coordinate a new assembly through delivery.

Made in USAUL 891 switchboard assemblies — low voltage onlyAccelerated lead times — confirm availability
Project-specific

Define the application and requirements.

Built in the USA

Discuss equipment and assembly options.

Schedule-aware

Confirm lead times for your order.

What makes a lineup metal-clad

Applicable metal-clad switchgear uses grounded metal partitions to separate major components, including circuit breakers, bus conductors and cable or termination areas. This compartmentalized construction distinguishes it from equipment whose internal spaces are not divided in the same way. The arrangement is intended to limit exposure between compartments during normal access and switching operations, but it does not eliminate electrical hazards or replace operating procedures.

The term covers equipment designed for particular voltage and application ranges; it should not be treated as a synonym for every switchboard or switchgear lineup. Confirm the system voltage, fault duty, application and governing project requirements before selecting a construction type. UL 891 applies to switchboard assemblies, not as a blanket listing for medium- or high-voltage metal-clad switchgear.

Drawout breakers and their positions

A drawout circuit breaker is mounted on a mechanism that allows it to move between defined operating positions. Depending on the design, these commonly include connected, test and disconnected positions. In the connected position, primary contacts engage the switchgear circuit. In a test position, control functions may be checked while the primary circuit is isolated; the exact capabilities and interlocks depend on the specified equipment.

Drawout construction can support inspection, testing or replacement workflows without treating the breaker as a permanently fixed component. It also adds requirements for handling space, lifting or racking provisions, access clearance and trained personnel. Specify the breaker type, control voltage, accessories, position indication and intended maintenance practices. Confirm operating and safety procedures with the equipment documentation and qualified personnel rather than assuming all drawout designs operate identically.

Compartments, barriers and access

Compartment boundaries influence how the lineup is arranged and how technicians reach breakers, bus sections, instrument transformers and cable terminations. Grounded metal barriers provide physical separation between these areas, while shutters or other provisions may cover primary contacts when a breaker is withdrawn. The precise construction and access points vary by design and must be reviewed against the project specification.

Review cable entry direction, termination space, conduit or bus-duct interfaces, control wiring routes and required working clearances early. A compact lineup that fits a one-line diagram may still conflict with room doors, overhead services or cable bending requirements. Provide available room plans and connection details so the proposed configuration can be evaluated before fabrication. Final layout and installation requirements remain subject to engineering review and applicable authority approval.

Ratings and protection details to resolve

A useful specification identifies nominal system voltage, frequency, continuous current, short-circuit or interrupting requirements, insulation levels where applicable, and the project’s grounding arrangement. These values must come from the system study and design basis, not from assumptions based on an existing lineup. Also identify the main and feeder arrangement, bus configuration, source connections, metering needs and any tie or transfer scheme.

Protection and control requirements can include relay functions, trip and close circuits, current and voltage transformer ratios, communications interfaces, alarms and auxiliary contacts. List required functions and interfaces without presuming a particular relay package or protocol will fit every design. Engineering should confirm coordination, instrument-transformer selection, control schematics and compatibility with the facility system before release. The manufacturer can build to the agreed scope; the project team remains responsible for establishing design criteria.

Procurement information for a Georgia project

For a quote, share the one-line diagram, equipment schedule, specification, system study results and any existing interface drawings. Identify the required lineup arrangement, breaker quantities and ratings, bus connections, enclosure and environmental conditions, cable entrance locations, control power, metering and protection scope. Include the project location in Georgia, requested delivery window, receiving constraints and the responsible parties for technical review and approvals.

New equipment is built to the confirmed scope, with American-made components and custom configurations available where applicable. Component selection, availability and production timing depend on the order details; exact scope and timeline are confirmed for each project. Nationwide shipping can support delivery to a Georgia project site, with shipment planning coordinated around the confirmed configuration and site receiving requirements.

From approved drawings to handoff

Before production, reconcile approved drawings with the one-line diagram, breaker and relay schedules, termination plan, control schematics and physical lineup dimensions. Resolve deviations, interface responsibilities and submittal comments in writing. Changes after approval can affect configuration, component availability and schedule, so document decisions through the project’s established review process.

For an efficient handoff, send the current design package and list the questions that still need resolution: system ratings, breaker positions and accessories, cable entry, room constraints, protection functions, delivery access and required documentation. Ask the project engineer to confirm design criteria and the authority having jurisdiction to review applicable requirements. With those inputs established, the manufacturer can quote a defined new metal-clad assembly and coordinate its Georgia delivery around the project plan.

Planning reference

Project specifications

Specifications are confirmed for each order
ScopeRequested by quote
VoltageBased on project requirements
CurrentSpecified to order
ListingDependent on the applicable assembly. UL 891 applies to applicable low-voltage switchboard assemblies, not medium- or high-voltage equipment.