Start with the vessel interface
Identify every vessel type the installation is expected to serve, then document its electrical service requirements. Relevant details include phase, nominal voltage, frequency, full-load current, connection arrangement and any limits on voltage variation. A berth serving one defined vessel may call for a different distribution plan than a terminal intended to accommodate vessels with differing onboard systems.
Clarify how power is transferred between shore equipment and the vessel. The interface may involve a fixed connection point, a cable management system or other project-specific components. Record connector type, cable reach, connection sequence and any interlocks or control signals required by the selected system. Confirm responsibility for each interface component so the switchboard scope does not omit equipment assigned to another supplier.
Define the shore-side distribution
Map the electrical path from the utility or site source through transformation, main distribution, feeder protection and the berth connection. Provide the available source voltage, frequency, phase arrangement, transformer details, and the number and size of feeders. Identify whether the system serves one vessel at a time or multiple berths, and whether loads must be transferred or isolated during changes in service.
Ask the project engineer to establish load calculations and the protective-device coordination basis. The switchboard configuration depends on calculated demand, fault-current information, feeder arrangement and the intended operating sequence. If the source can change, or shore power must coordinate with onboard generation, document the relevant operating modes and control requirements rather than assuming a single steady-state condition.
Resolve grounding and protection
Grounding must be defined across the shore source, distribution equipment, vessel connection and vessel electrical system. Provide the project grounding design, including the grounding conductor path and any required separation or bonding arrangements. Do not infer the vessel’s grounding method from a shore-side standard configuration; confirm the interface with the marine electrical engineer and the vessel’s technical documentation.
Protection details should follow the engineered system, not a generic marine template. Share available fault-current data, protective-device settings or coordination study requirements, and any specified ground-fault or other monitoring functions. The engineer of record and applicable authorities determine the design and acceptance criteria. The equipment manufacturer can build to the approved drawings and defined requirements, but cannot establish vessel compatibility from incomplete interface data.
Specify ratings for the site
State the required voltage, current and frequency ratings for each section, along with the short-circuit withstand or interrupting requirements established by the design. Include enclosure type, installation location and environmental exposure. A sheltered electrical room, an exposed pier and a washdown area present different enclosure and material considerations; salt air, moisture, temperature and potential contamination should be addressed in the project specification.
Also identify access, cable entry, clearances, lifting and anchorage constraints, plus any space limits at the berth or in an electrical room. For a custom-built assembly, provide one-line diagrams, elementary diagrams, schedules, physical layout information and specified components where available. UL 891 applies to switchboard assemblies; it should not be treated as a blanket certification for medium- or high-voltage equipment or for the complete shore-to-vessel installation.
Plan procurement and delivery
For a useful quotation, share the one-line diagram, equipment schedule, source and load data, fault-current information, grounding requirements, vessel interface details, environmental conditions, preferred component requirements and project drawing status. Note requested submittals, inspection or testing provisions, documentation needs and any required division of scope. Exact configuration, component availability and production timeline are confirmed for each order.
Georgia ports, terminals and shipyards may have project schedules tied to berth access, vessel calls or construction sequencing. Include the delivery location, receiving limitations, unloading arrangements and required on-site date when requesting pricing. Nationwide shipping can support Georgia project delivery, but routing and timing depend on the completed equipment and shipment plan. Coordinate delivery with site readiness and the work of the electrical contractor and marine interface teams.
Carry the design through handoff
Before release for manufacture, reconcile approved drawings with the vessel connection details, protection scheme, grounding design, ratings and physical layout. Assign named project parties to resolve drawing comments and verify interface dimensions. Changes to vessel type, feeder count, source characteristics or installation location can affect the equipment scope, so capture revisions through a controlled approval process.
For the next step, assemble the project’s one-line diagram, vessel electrical requirements, site conditions and target delivery location, then identify open engineering decisions. That package gives the manufacturer a practical basis to review a custom shore-side distribution configuration, clarify scope and confirm order timing for the Georgia project.